Regenerative Thermal Oxidizer
Site Activities Week of June 25, 2018
June 22, 2018
Activated Carbon Treatment Units
Site Activities Week of July 09, 2018
July 9, 2018

Site Activities Week of July 02, 2018

Power Control Units

Power Control Units

Update for Week of July 02, 2018:

Electrical Resistance Heating (ERH) treatment system operating measures as of June 29, 2018:

  • Average subsurface temperature has risen to 40º C versus a target temperature of 87º C.
  • The ERH system has applied 1,590,121 kWh of the estimated 8,255,000 kWh to complete treatment. This represents 19% of the estimated total energy necessary to complete remediation.
  • The perimeter air monitoring system has shown no TCE emissions at the perimeter of the site. The air monitoring results are available on EPA’s website at https://cumulis.epa.gov/supercpad/cursites/csitinfo.cfm?id=0402598.
  • The estimated TCE removal to-date is 37 pounds.

Please note that you may see occasional steam from the thermal treatment unit during system operation.  This is normal water condensation caused by weather conditions, and not a release of TCE vapor.

 

Site Safety:

Please be aware that this is an active and secured site.  Thank you for respecting the safety boundaries and please do not enter the site for any reason.